![](https://bureaulabaki.com/wp-content/uploads/2023/12/WhatsApp-Image-2023-12-08-at-6.53.42-PM-300x300.jpeg)
IMPLEMENTATION OF AN OFF GRID PHOTOVOLTAIC SYSTEM
Project Description:
The villa relies primarily on a 20 kWp Photovoltaic System, which plays a central role in supplying power whenever the Mains are not available, supported by a 25.6 kWh High
Voltage Lithium Battery Bank. Project Responsibilities: Engineering, Procurement, and Construction of the Photovoltaic System.
![](https://bureaulabaki.com/wp-content/uploads/2023/12/jack-ssaaadeh.png)
![](https://bureaulabaki.com/wp-content/uploads/2023/12/jack-ssaaadeh.png)