A- GENERATOR SETS SYNCHRONIZATION SYSTEM PROJECT | Byblos, Lebanon
Scope of Work:
Design and Installation of Master Distribution Board, including needed busbars, circuit breakers & contactors, with the integration of Four DeepSea DSE8610 MKII | Load Sharing & Synchronizing Control
Modules for the synchronization of Four Caterpillar Generator Sets with respective apparent power 2x500kVA & 2x725kVA.
B- POWER QUALITY STUDY
Details:
- Monitoring of electrical network
- Harmonic Source Identification
- Modelling and Simulation
- Design of Mitigation Scheme