Project Description:
45.7 kWp Hybrid Photovoltaic System integrated with emergency power grid in case of national power outage.
More than 72,000 kWh will be injected into a residential compound’s grid with high energy consumption, such way the Return On Investment will be 42%.
Scope of Work:
Engineering, Procurement, and Construction of the Hybrid Photovoltaic System.